/

    【News】

    Date. Contents
    2019.04.03

    New!!!
    【Receive report cooperator】
    We introduce the person who received the reception reports form.
    [JG1TWP,JH4XSY,N1AIA,JH4DHX,VE2GVB,JA10GZ,K7WD0,JA1GDE
    JS2GGD,JO1PTD,JA1CPA,JH1DIS,JE0JDY,JF1PTU]

    We will use the data you received for checking the power status of this satellite. Thank you very much. Based on the receive data, we will prepare a graph of bus voltage, and will be released on House keeping data page.
    2019.04.02

    【Homepage upgraded】
    MemberPaper,Satellite Imagespage has been updated.
    2019.03.21

    【Top page updated】
    The slideshow on the top page has been updated. Images taken by NEXUS are being added to the slide show.
    Jan 26,2019
    New!!!
    【Receive report cooperator】
    We introduce the person who received the reception report from Reception reports form.
    [IU2ZZZ,JAOCAW,JA0OAV,JA1CPA,JA1GDE,JA6PL,JA7KPI,JE0JDY,
    JE1CVL,JE1HJJ,JF1PTU,JG1LXL,JG1TWP,JG7LBN,JH3BUMCW,JH4WHW,
    JO1XWH,JQ1YCZ,JQ1ZZZ,JR6RMK,JS2GGD,JS6RTJ,K7WDO,N1AIA]

    We will use the data you received for checking the power status of this satellite. Thank you very much. Based on the receive data, we will prepare a graph of bus voltage, and will be released on House keeping data page.
    Jan 22,2019

    【About current NEXUS status (Update 21:00)】
    We sent a CW restart command at the night operation second time (11:31:28~11:43:02(UTC)) and confirmed that CW output was successfully restarted. We confirmed the telemetry information at CW and confirmed that no problems occurred in the satellite system. We are sorry we have caused you a lot of worries for many people this time. We will review the operation system so that such things do not reoccur.
    Jan 22,2019

    【About current NEXUS status (Update 13:30)】
    Currently, the CW of NEXUS is stopping. It seems that this stop came from 13:40 (UTC) on January 21, 2019. This is a mistake of the uplink command.
    On January 22, 2019, from 10:2 to 10:6(UTC), uplink of CW transmission restart command is scheduled.
    We are truly sorry for the inconvenience caused to everyone.
    We will be informed as soon as there is progress, we would be pleased if you could check it.
    Jan 19,2019【Receive report cooperator】
    We introduce the person who received the reception report from Reception reports form.
    [JE6RJA,JA0CAW,JE0JDY,JS6RTJ,LU2DPW,JA7KPI,JA1GDE,JS2GGD,
    JQ1ZZZ,JR6RMK,JI1SZP,JH3BUM,JG7LBN,N1AIA,JN4RYW,JO1PTD,
    JF1PTU,JA6PL]

    We will use the data you received for checking the power status of this satellite. Thank you very much. In addition, there are a lot of people who have reported receipts via Twitter. We will also introduce here as well.
    Based on the receive data, we will prepare a graph of bus voltage, and will be released on the operational information page.
    Jan 17,2019
    【About live distribution of NEXUS's initial operation】
    The initial operation of NEXUS is planned to perform live distribution on January 18, 2019(Friday). Live distribution will be available from 20 o'clock(JST). Click here for live distribution.
    Also, since 19:30 on that day, we will release the ground stations in the 3rd floor of Funabashi Campus Building No. 3, so if you have time, please come and listen to the first beacon of NEXUS! !
    Jan 16,2019
    【About public viewing(Change the room.)】
    On January 18, 2019(Friday), public viewing will be held following the launch of NEXUS.

    Date:18/01/2019,AM9:00〜11:00
    Place:Nihon University Funabashi Campus Techno Place 15 Large Conference Room

    Please check here for more details.
    Jan 15,2019【REQ:Notice of postponement of NEXUS launch】
    The launch planned for January 17, 2019 was postponed to January 18, 2019.For details,please see the JAXA press release.Following this,"Public viewing" and "Initial operation live delivery" scheduled on the 17th will also be postponed. Incidentally, the latest information will be announced at「News(this page)」,please check also here.
    Jan 14,2019【About live distribution of NEXUS's initial operation】
    The initial operation of NEXUS is planned to perform live distribution on Youtube. Live distribution will be available from 20 o'clock(JST). Click here for live distribution.
    Jan 14,2019【About public viewing】
    On January 17, 2019(Thursday), public viewing will be held following the launch of NEXUS. Please check here for more details.


    【Website update】

    Date. Contents
    Apl 03,2019
    New!!!
    Update of 「House keeping data」.
    Feb 02,2019
    Update of 「Satellite images」.
    Jan 29,2019
    Update of 「Telemetry format」.
    Jan 26,2019Update of 「House keeping data」,「Satellite images」.
    Jan 17,2019Update of 「TOP」.
    Jan 15,2019Update of 「News」 ,「Initial operation / Initial TLE」and「About NEXUS」.
    Jan 14,2019Update of 「News」 and「Member」.
    Jan 11,2019Update of 「Initial operation / Initial TLE」.
    ※The TLE of immediately after separation is changed.
    Jan 11,2019Update of 「Initial operation / Initial TLE」and「Acknowledgements」.
    Jan 10,2019Establishment of 「Operational information・TLE」and「News(this page)」.