2016/July/25 Nigttime Operation Report

皆様の受信報告はSPROUTの状態を解析するために役立てております.受信協力をお願い致します.現在はメインミッションの膜面展開を行い,展開したかどうかの確認をしております.
Your reception report is being used to analyze the state. We ask the cooperation of the reception. Then we are confirming the deployment of combined membrane structure which is SPROUT’s main mission.

[現在のSPROUTの状態]/[Current status of SPROUT]
現在SPROUTはCW(カスタムモード:G7/DEF/437.525[MHz])運用を行っています.
Current status of SPROUT is CW(custom mode:G7/DEF/437.525[MHz]).

[次回の運用内容]/[Next Operation]
FMダウンリンク(437.600[MHz]/1200bps/AFSK)を行います.
We will operate FM downlink(437.600[MHz]/1200bps/AFSK).

[運用のお知らせ]/[Operation info.]
SSTV運用(437.600[MHz])7月30日11:00~16:00,22:00~27:00(JST)に行います.
We will operate SSTV downlink(437.600[MHz]) on 30th July. 11:00~16:00,22:00~27:00(JST).

[運用結果]/[Operational results]
2016/7/25 夜の運用を2回行いました.
2016/7/25 Nighttime operation: We have conducted 2 operations.

3rd:CW:S3[dB] FM:–[dB] Digi:–[dB] Bus Voltage:3.815[V]
4th:CW:S1[dB] FM:–[dB] Digi:–[dB] Bus Voltage:3.798[V]

3rd:CW運用を行い,バス電圧3.815[V]を確認しました.
4th:CW運用を行い,バス電圧3.798[V]を確認しました.

3rd:We comformed bus voltage 3.815[V] by CW operation.
4th:We comformed bus voltage 3.798[V] by CW operation.

[次回パス情報]/[Next pass info.]
日付 || 時刻:AOS ~ LOS || 可視時間 || 方位角: AOS時 ⇒ LOS時 / 最大迎角時 || 最大迎角
Date(JST) || Time of AOS ~ LOS || Duration || Azimuth at AOS ⇒ LOS / MEL || MEL
————————————————————————————————————————–
2016/07/26 || 11:52:59 ~ 12:05:56 || 00:12:57 || 013.4 ⇒ 190.1 / 111.2 || 76.7
2016/07/26 || 13:30:13 ~ 13:39:16 || 00:09:03 || 341.7 ⇒ 251.3 / 297.4 || 08.1
————————————————————————————————————————–
2016/07/26 || 22:43:32 ~ 22:55:58 || 00:12:26 || 148.5 ⇒ 357.4 / 075.0 || 38.3
2016/07/27 || 00:20:22 ~ 00:31:16 || 00:10:54 || 208.1 ⇒ 325.6 / 267.4 || 14.6
————————————————————————————————————————–
2016/07/27 || 10:33:21 ~ 10:42:27 || 00:09:06 || 044.8 ⇒ 135.8 / 089.5 || 07.7
2016/07/27 || 12:07:47 ~ 12:20:41 || 00:12:54 || 009.0 ⇒ 198.8 / 291.9 || 70.4
————————————————————————————————————————–

[The latest TLE]

SPROUT                  
1 39770U 14029E   16206.54839202  .00000634  00000-0  79774-4 0  9991
2 39770  97.8730 303.3595 0008502 329.3279  30.7433 14.85480172117481

The downlink data format is.
JPN:http://sat.aero.cst.nihon-u.ac.jp/sprout/2-Formats%20of%20telemetry.html
ENG:http://sat.aero.cst.nihon-u.ac.jp/sprout-e/2-Formats%20of%20telemetry-e.html

2016/July/25 Daytime Operation Report

皆様の受信報告はSPROUTの状態を解析するために役立てております.受信協力をお願い致します.現在はメインミッションの膜面展開を行い,展開したかどうかの確認をしております.
Your reception report is being used to analyze the state. We ask the cooperation of the reception. Then we are confirming the deployment of combined membrane structure which is SPROUT’s main mission.

[現在のSPROUTの状態]/[Current status of SPROUT]
現在SPROUTはCW(カスタムモード:G7/DEF/437.525[MHz])運用を行っています.
Current status of SPROUT is CW(custom mode:G7/DEF/437.525[MHz]).

[次回の運用内容]/[Next Operation]
FMダウンリンク(437.600[MHz]/1200bps/AFSK)を行います.
We will operate FM downlink(437.600[MHz]/1200bps/AFSK).

[運用のお知らせ]/[Operation info.]
SSTV運用(437.600[MHz])7月30日22:00~27:00(JST)に行います.
We will operate SSTV downlink(437.600[MHz]) on 30th July.22:00~27:00(JST).

[運用結果]/[Operational results]
2016/7/25 昼の運用を2回行いました.
2016/7/25 Daytime operation: We have conducted 2 operations.

1st:CW:–[dB] FM:S7[dB] Digi:–[dB] Bus Voltage:-.—[V]
2nd:CW:S3[dB] FM:–[dB] Digi:–[dB] Bus Voltage:4.609[V]

1st:FMダウンリンク(437.600[MHz]/1200bps/AFSK)を行いました.
2nd:CW運用を行い,バス電圧4.609[V]を確認しました.

1st:We operated FM downlink(437.600[MHz]/1200bps/AFSK).
2nd:We comformed bus voltage 4.609[V] by CW operation.

[次回パス情報]/[Next pass info.]
日付 || 時刻:AOS ~ LOS || 可視時間 || 方位角: AOS時 ⇒ LOS時 / 最大迎角時 || 最大迎角
Date(JST) || Time of AOS ~ LOS || Duration || Azimuth at AOS ⇒ LOS / MEL || MEL
————————————————————————————————————————–
2016/07/25 || 22:29:04 ~ 22:41:00 || 00:11:56 || 139.4 ⇒ 001.9 / 070.9 || 26.2
2016/07/26 || 00:05:03 ~ 00:16:48 || 00:11:45 || 198.0 ⇒ 331.5 / 263.3 || 21.6
————————————————————————————————————————–
2016/07/26 || 11:52:59 ~ 12:05:56 || 00:12:57 || 013.4 ⇒ 190.1 / 111.2 || 76.7
2016/07/26 || 13:30:13 ~ 13:39:16 || 00:09:03 || 341.7 ⇒ 251.3 / 297.4 || 08.1
————————————————————————————————————————–
2016/07/26 || 22:43:32 ~ 22:55:58 || 00:12:26 || 148.5 ⇒ 357.4 / 075.0 || 38.3
2016/07/27 || 00:20:22 ~ 00:31:16 || 00:10:54 || 208.1 ⇒ 325.6 / 267.4 || 14.6
————————————————————————————————————————–

[The latest TLE]

SPROUT                  
1 39770U 14029E   16206.54839202  .00000634  00000-0  79774-4 0  9991
2 39770  97.8730 303.3595 0008502 329.3279  30.7433 14.85480172117481

The downlink data format is.
JPN:http://sat.aero.cst.nihon-u.ac.jp/sprout/2-Formats%20of%20telemetry.html
ENG:http://sat.aero.cst.nihon-u.ac.jp/sprout-e/2-Formats%20of%20telemetry-e.html

2016/July/24 Nigttime Operation Report

皆様の受信報告はSPROUTの状態を解析するために役立てております.受信協力をお願い致します.現在はメインミッションの膜面展開を行い,展開したかどうかの確認をしております.
Your reception report is being used to analyze the state. We ask the cooperation of the reception. Then we are confirming the deployment of combined membrane structure which is SPROUT’s main mission.

[現在のSPROUTの状態]/[Current status of SPROUT]
現在SPROUTはCW(カスタムモード:G7/DEF/437.525[MHz])運用を行っています.
Current status of SPROUT is CW(custom mode:G7/DEF/437.525[MHz]).

[次回の運用内容]/[Next Operation]
FMダウンリンク(437.600[MHz]/1200bps/AFSK)を行います.
We will operate FM downlink(437.600[MHz]/1200bps/AFSK).

[運用のお知らせ]/[Operation info.]
SSTV運用(437.600[MHz])7月30日11:00~16:00,22:00~27:00(JST)に行います.
We will operate SSTV downlink(437.600[MHz]) on 30th July. 11:00~16:00,22:00~27:00(JST).

[運用結果]/[Operational results]
2016/7/24 夜の運用を2回行いました.
2016/7/24 Nighttime operation: We have conducted 2 operations.

3rd:CW:S3[dB] FM:–[dB] Digi:–[dB] Bus Voltage:3.834[V]
4th:CW:S1[dB] FM:–[dB] Digi:–[dB] Bus Voltage:3.809[V]

3rd:CW運用を行い,バス電圧3.834[V]を取得しました.
4th:CW運用を行い,バス電圧3.809[V]を取得しました.

3rd:We confirmed bus voltage 3.834[V] by CW operation.
4th:We confirmed bus voltage 3.809[V] by CW operation.

[次回パス情報]/[Next pass info.]
日付 || 時刻:AOS ~ LOS || 可視時間 || 方位角: AOS時 ⇒ LOS時 / 最大迎角時 || 最大迎角
Date(JST) || Time of AOS ~ LOS || Duration || Azimuth at AOS ⇒ LOS / MEL || MEL
————————————————————————————————————————–
2016/07/25 || 11:38:15 ~ 11:51:03 || 00:12:48 || 018.0 ⇒ 181.3 / 101.0 || 49.7
2016/07/25 || 13:14:58 ~ 13:25:18 || 00:10:20 || 347.8 ⇒ 240.3 / 293.5 || 12.5
————————————————————————————————————————–
2016/07/25 || 22:29:04 ~ 22:41:00 || 00:11:56 || 139.4 ⇒ 001.9 / 070.9 || 26.2
2016/07/26 || 00:05:02 ~ 00:16:48 || 00:11:46 || 198.0 ⇒ 331.6 / 263.4 || 21.6
————————————————————————————————————————–
2016/07/26 || 11:52:59 ~ 12:05:56 || 00:12:57 || 013.4 ⇒ 190.1 / 111.8 || 76.6
2016/07/26 || 13:30:12 ~ 13:39:16 || 00:09:04 || 341.8 ⇒ 251.2 / 297.3 || 08.1
————————————————————————————————————————–

[The latest TLE]

SPROUT                  
1 39770U 14029E   16203.98872842  .00001270  00000-0  15345-3 0  9993
2 39770  97.8734 300.8283 0008572 338.6285  21.4529 14.85478008117105

The downlink data format is.
JPN:http://sat.aero.cst.nihon-u.ac.jp/sprout/2-Formats%20of%20telemetry.html
ENG:http://sat.aero.cst.nihon-u.ac.jp/sprout-e/2-Formats%20of%20telemetry-e.html

2016/July/24 Daytime Operation Report

皆様の受信報告はSPROUTの状態を解析するために役立てております.受信協力をお願い致します.現在はメインミッションの膜面展開を行い,展開したかどうかの確認をしております.
Your reception report is being used to analyze the state. We ask the cooperation of the reception. Then we are confirming the deployment of combined membrane structure which is SPROUT’s main mission.

[現在のSPROUTの状態]/[Current status of SPROUT]
現在SPROUTはCW(カスタムモード:G7/DEF/437.525[MHz])運用を行っています.
Current status of SPROUT is CW(custom mode:G7/DEF/437.525[MHz]).

[次回の運用内容]/[Next Operation]
FMダウンリンク(437.600[MHz]/1200bps/AFSK)を行います.
We will operate FM downlink(437.600[MHz]/1200bps/AFSK).

[運用のお知らせ]/[Operation info.]
SSTV運用(437.600[MHz])7月30日22:00~27:00(JST)に行います.
We will operate SSTV downlink(437.600[MHz]) on 30th July.22:00~27:00(JST).

[運用結果]/[Operational results]
2016/7/24 昼の運用を2回行いました.
2016/7/24 Daytime operation: We have conducted 2 operations.

1st:CW:S0[dB] FM:–[dB] Digi:–[dB] Bus Voltage:-.—[V]
2nd:CW:S1[dB] FM:S5[dB] Digi:–[dB] Bus Voltage:4.598[V]

1st:CW運用を行いましたが,バス電圧の取得にはいたりませんでした.
2nd:CW運用を行い,バス電圧4.598[V]を確認後,FMダウンリンク(437.600[MHz]/1200bps/AFSK)を行いました.

1st:We couldn’t confirm bus voltage by CW operation.
2nd:We comformed bus voltage 4.598[V] by CW operation and operated FM downlink(437.600[MHz]/1200bps/AFSK).

[次回パス情報]/[Next pass info.]
日付 || 時刻:AOS ~ LOS || 可視時間 || 方位角: AOS時 ⇒ LOS時 / 最大迎角時 || 最大迎角
Date(JST) || Time of AOS ~ LOS || Duration || Azimuth at AOS ⇒ LOS / MEL || MEL
————————————————————————————————————————–
2016/07/24 || 22:14:45 ~ 22:25:59 || 00:11:14 || 130.0 ⇒ 006.7 / 068.6 || 18.2
2016/07/24 || 23:49:54 ~ 00:02:14 || 00:12:20 || 327.4 ⇒ 336.8 / 261.5 || 31.8
————————————————————————————————————————–
2016/07/25 || 11:38:14 ~ 11:51:02 || 00:12:48 || 018.0 ⇒ 181.3 / 101.5 || 49.7 *
2016/07/25 || 13:14:58 ~ 13:25:18 || 00:10:20 || 347.7 ⇒ 240.2 / 293.3 || 12.5
————————————————————————————————————————–
2016/07/25 || 22:29:04 ~ 22:41:00 || 00:11:56 || 139.4 ⇒ 001.9 / 070.9 || 26.2
2016/07/26 || 00:05:02 ~ 00:16:48 || 00:11:46 || 198.0 ⇒ 331.6 / 263.4 || 21.6
————————————————————————————————————————–

[The latest TLE]

SPROUT                  
1 39770U 14029E   16205.53799912  .00000893  00000-0  10972-3 0  9993
2 39770  97.8733 302.3602 0008593 333.0007  27.0745 14.85479818117337

The downlink data format is.
JPN:http://sat.aero.cst.nihon-u.ac.jp/sprout/2-Formats%20of%20telemetry.html
ENG:http://sat.aero.cst.nihon-u.ac.jp/sprout-e/2-Formats%20of%20telemetry-e.html

2016/July/23 Nigttime Operation Report

皆様の受信報告はSPROUTの状態を解析するために役立てております.受信協力をお願い致します.現在はメインミッションの膜面展開を行い,展開したかどうかの確認をしております.
Your reception report is being used to analyze the state. We ask the cooperation of the reception. Then we are confirming the deployment of combined membrane structure which is SPROUT’s main mission.

[現在のSPROUTの状態]/[Current status of SPROUT]
現在SPROUTはCW(カスタムモード:G7/DEF/437.525[MHz])運用を行っています.
Current status of SPROUT is CW(custom mode:G7/DEF/437.525[MHz]).

[次回の運用内容]/[Next Operation]
FMダウンリンク(437.600[MHz]/1200bps/AFSK)を行います.
We will operate FM downlink(437.600[MHz]/1200bps/AFSK).

[運用のお知らせ]/[Operation info.]
SSTV運用(437.600[MHz])7月30日11:00~16:00,22:00~27:00(JST)に行います.
We will operate SSTV downlink(437.600[MHz]) on 30th July. 11:00~16:00,22:00~27:00(JST).

[運用結果]/[Operational results]
2016/7/23 夜の運用を2回行いました.
2016/7/23 Nighttime operation: We have conducted 2 operations.

3rd:CW:S1[dB] FM:S5[dB] Digi:–[dB] Bus Voltage:3.821[V]
4th:CW:–[dB] FM:S5[dB] Digi:–[dB] Bus Voltage:-.—[V]

3rd:CW運用を行い,バス電圧3.821[V]を取得しました.その後,FMダウンリンク(437.600[MHz]/1200bps/AFSK)を行いました.
4th:FMダウンリンク(437.600[MHz]/1200bps/AFSK)を行いました.

3rd:We confirmed bus voltage 3.821[V] by CW operation. After that, We operated FM downlink(437.600[MHz]/1200bps/AFSK).
4th:We operated FM downlink(437.600[MHz]/1200bps/AFSK).

[次回パス情報]/[Next pass info.]
日付 || 時刻:AOS ~ LOS || 可視時間 || 方位角: AOS時 ⇒ LOS時 / 最大迎角時 || 最大迎角
Date(JST) || Time of AOS ~ LOS || Duration || Azimuth at AOS ⇒ LOS / MEL || MEL
————————————————————————————————————————–
2016/07/24 || 11:23:34 ~ 11:36:02 || 00:12:28 || 022.9 ⇒ 172.2 / 098.7 || 32.9
2016/07/24 || 12:59:51 ~ 13:11:08 || 00:11:17 || 353.0 ⇒ 230.3 / 291.3 || 18.1
————————————————————————————————————————–
2016/07/24 || 22:14:45 ~ 22:25:59 || 00:11:14 || 130.0 ⇒ 006.7 / 068.6 || 18.2
2016/07/24 || 23:49:54 ~ 00:02:14 || 00:12:20 || 327.4 ⇒ 336.8 / 261.5 || 31.8
————————————————————————————————————————–
2016/07/25 || 11:38:15 ~ 11:51:03 || 00:12:48 || 018.0 ⇒ 181.3 / 101.0 || 49.7
2016/07/25 || 13:14:58 ~ 13:25:18 || 00:10:20 || 347.8 ⇒ 240.3 / 293.5 || 12.5
————————————————————————————————————————–

[The latest TLE]

SPROUT                  
1 39770U 14029E   16203.98872842  .00001270  00000-0  15345-3 0  9993
2 39770  97.8734 300.8283 0008572 338.6285  21.4529 14.85478008117105

The downlink data format is.
JPN:http://sat.aero.cst.nihon-u.ac.jp/sprout/2-Formats%20of%20telemetry.html
ENG:http://sat.aero.cst.nihon-u.ac.jp/sprout-e/2-Formats%20of%20telemetry-e.html

2016/July/23 Daytime Operation Report

皆様の受信報告はSPROUTの状態を解析するために役立てております.受信協力をお願い致します.現在はメインミッションの膜面展開を行い,展開したかどうかの確認をしております.
Your reception report is being used to analyze the state. We ask the cooperation of the reception. Then we are confirming the deployment of combined membrane structure which is SPROUT’s main mission.

[現在のSPROUTの状態]/[Current status of SPROUT]
現在SPROUTはCW(カスタムモード:G7/DEF/437.525[MHz])運用を行っています.
Current status of SPROUT is CW(custom mode:G7/DEF/437.525[MHz]).

[次回の運用内容]/[Next Operation]
SSTV運用(437.600[MHz])を行います.
We will operate SSTV downlink(437.600[MHz]).

[運用のお知らせ]/[Operation info.]
SSTV運用(437.600[MHz])7月23日22:00~27:00(JST)に行います.
We will operate SSTV downlink(437.600[MHz]) on 23rd July.22:00~27:00(JST).

[運用結果]/[Operational results]
2016/7/23 昼の運用を2回行いました.
2016/7/23 Daytime operation: We have conducted 2 operations.

1st:CW:S0[dB] FM:S5[dB] Digi:–[dB] Bus Voltage:-.—[V]
2nd:CW:–[dB] FM:S5[dB] Digi:–[dB] Bus Voltage:-.—[V]

1st:CW運用を行いましたが,入感が一切ありませんでした.FMダウンリンク(437.600[MHz]/1200bps/AFSK)を行いました..
2nd:FMダウンリンク(437.600[MHz]/1200bps/AFSK)を行いました.

1st:We couldn’t confirm bus voltage by CW operation and operated FM downlink(437.600[MHz]/1200bps/AFSK).
2nd:We operated FM downlink(437.600[MHz]/1200bps/AFSK).

[次回パス情報]/[Next pass info.]
日付 || 時刻:AOS ~ LOS || 可視時間 || 方位角: AOS時 ⇒ LOS時 / 最大迎角時 || 最大迎角
Date(JST) || Time of AOS ~ LOS || Duration || Azimuth at AOS ⇒ LOS / MEL || MEL
————————————————————————————————————————–
2016/07/23 || 22:00:34 ~ 22:10:51 || 00:10:17 || 119.9 ⇒ 012.0 / 066.4 || 12.5
2016/07/23 || 23:34:52 ~ 23:47:33 || 00:12:41 || 179.4 ⇒ 341.7 / 259.3 || 48.1
————————————————————————————————————————–
2016/07/24 || 11:23:34 ~ 11:36:02 || 00:12:28 || 022.9 ⇒ 172.2 / 098.7 || 32.9
2016/07/24 || 12:59:51 ~ 13:11:08 || 00:11:17 || 353.0 ⇒ 230.3 / 291.3 || 18.1
————————————————————————————————————————–
2016/07/24 || 22:14:45 ~ 22:25:59 || 00:11:14 || 130.0 ⇒ 006.7 / 068.6 || 18.2
2016/07/24 || 23:49:54 ~ 00:02:14 || 00:02:13 || 327.4 ⇒ 336.8 / 261.5 || 31.8
————————————————————————————————————————–

[The latest TLE]

SPROUT                  
1 39770U 14029E   16202.77625515  .00001443  00000-0  17341-3 0  9992
2 39770  97.8738 299.6293 0008577 343.0045  17.0896 14.85475724116923

The downlink data format is.
JPN:http://sat.aero.cst.nihon-u.ac.jp/sprout/2-Formats%20of%20telemetry.html
ENG:http://sat.aero.cst.nihon-u.ac.jp/sprout-e/2-Formats%20of%20telemetry-e.html

2016/July/21 Nigttime Operation Report

皆様の受信報告はSPROUTの状態を解析するために役立てております.受信協力をお願い致します.現在はメインミッションの膜面展開を行い,展開したかどうかの確認をしております.
Your reception report is being used to analyze the state. We ask the cooperation of the reception. Then we are confirming the deployment of combined membrane structure which is SPROUT’s main mission.

[現在のSPROUTの状態]/[Current status of SPROUT]
現在SPROUTはCW(カスタムモード:G7/DEF/437.525[MHz])運用を行っています.
Current status of SPROUT is CW(custom mode:G7/DEF/437.525[MHz]).

[次回の運用内容]/[Next Operation]
FMダウンリンク(437.600[MHz]/1200bps/AFSK)を行います.
We will operate FM downlink(437.600[MHz]/1200bps/AFSK).

[運用のお知らせ]/[Operation info.]
SSTV運用(437.600[MHz])7月23日11:00~16:00,22:00~27:00(JST)に行います.
We will operate SSTV downlink(437.600[MHz]) on 23rd July. 11:00~16:00,22:00~27:00(JST).

[運用結果]/[Operational results]
2016/7/21 夜の運用を3回行いました.
2016/7/21 Nighttime operation: We have conducted 3 operations.

3rd:CW:S0[dB] FM:–[dB] Digi:–[dB] Bus Voltage:-.—[V]
4th:CW:S0[dB] FM:–[dB] Digi:–[dB] Bus Voltage:-.—[V]
5th:CW:S0[dB] FM:–[dB] Digi:–[dB] Bus Voltage:-.—[V]

3rd:CW運用を行いましたが,バス電圧の取得には至りませんでした.
4th:CW運用を行いましたが,バス電圧の取得には至りませんでした.
5th:CW運用を行いましたが,バス電圧の取得には至りませんでした.

3rd:We couldn’t confirm bus voltage by CW operation.
4th:We couldn’t confirm bus voltage by CW operation.
5th:We couldn’t confirm bus voltage by CW operation.

[次回パス情報]/[Next pass info.]
日付 || 時刻:AOS ~ LOS || 可視時間 || 方位角: AOS時 ⇒ LOS時 / 最大迎角時 || 最大迎角
Date(JST) || Time of AOS ~ LOS || Duration || Azimuth at AOS ⇒ LOS / MEL || MEL
————————————————————————————————————————–
2016/07/22 || 10:54:30 ~ 11:05:33 || 00:11:03 || 034.0 ⇒ 152.8 / 093.1 || 15.2
2016/07/22 || 12:29:50 ~ 12:42:20 || 00:12:30 || 002.4 ⇒ 211.8 / 289.9 || 37.8
————————————————————————————————————————–
2016/07/22 || 21:46:35 ~ 21:55:36 || 00:09:01 || 108.9 ⇒ 018.1 / 064.5 || 08.1
2016/07/22 || 23:19:59 ~ 23:32:49 || 00:12:50 || 170.5 ⇒ 346.3 / 252.3 || 74.7 *
————————————————————————————————————————–
2016/07/23 || 11:08:59 ~ 11:20:53 || 00:11:54 || 028.1 ⇒ 162.9 / 097.1 || 22.3
2016/07/23 || 12:44:48 ~ 12:56:48 || 00:12:00 || 357.9 ⇒ 220.9 / 288.5 || 25.9
————————————————————————————————————————–
[The latest TLE]

SPROUT                  
1 39770U 14029E   16202.77625515  .00001443  00000-0  17341-3 0  9992
2 39770  97.8738 299.6293 0008577 343.0045  17.0896 14.85475724116923

The downlink data format is.
JPN:http://sat.aero.cst.nihon-u.ac.jp/sprout/2-Formats%20of%20telemetry.html
ENG:http://sat.aero.cst.nihon-u.ac.jp/sprout-e/2-Formats%20of%20telemetry-e.html

2016/July/21 Daytime Operation Report

皆様の受信報告はSPROUTの状態を解析するために役立てております.受信協力をお願い致します.現在はメインミッションの膜面展開を行い,展開したかどうかの確認をしております.
Your reception report is being used to analyze the state. We ask the cooperation of the reception. Then we are confirming the deployment of combined membrane structure which is SPROUT’s main mission.

[現在のSPROUTの状態]/[Current status of SPROUT]
現在SPROUTはCW(カスタムモード:G7/DEF/437.525[MHz])運用を行っています.
Current status of SPROUT is CW(custom mode:G7/DEF/437.525[MHz]).

[次回の運用内容]/[Next Operation]
FMダウンリンク(437.600[MHz]/1200bps/AFSK)を行います.
We will operate FM downlink(437.600[MHz]/1200bps/AFSK).

[運用のお知らせ]/[Operation info.]
SSTV運用(437.600[MHz])7月23日11:00~16:00, 22:00~27:00(JST)に行います.
We will operate SSTV downlink(437.600[MHz]) on 23rd July. 11:00~16:00, 22:00~27:00(JST).

[運用結果]/[Operational results]
2016/7/21 昼の運用を2回行いました.
2016/7/21 Daytime operation: We have conducted 2 operations.

1st:CW:–[dB] FM:–[dB] Digi:–[dB] Bus Voltage:-.—[V]
2nd:CW:–[dB] FM:S5[dB] Digi:–[dB] Bus Voltage:-.—[V]

1st:CW運用を行いましたが,入感が一切ありませんでした.
2nd:FMダウンリンク(437.600[MHz]/1200bps/AFSK)を行いました.

1st:We couldn’t confirm bus voltage by CW operation.
2nd:We operated FM downlink(437.600[MHz]/1200bps/AFSK)

[次回パス情報]/[Next pass info.]
日付 || 時刻:AOS ~ LOS || 可視時間 || 方位角: AOS時 ⇒ LOS時 / 最大迎角時 || 最大迎角
Date(JST) || Time of AOS ~ LOS || Duration || Azimuth at AOS ⇒ LOS / MEL || MEL
————————————————————————————————————————–
2016/07/21 || 21:32:52 ~ 21:40:09 || 00:07:17 || 096.2 ⇒ 025.6 / 060.9 || 04.6
2016/07/21 || 23:05:12 ~ 23:18:00 || 00:12:48 || 161.7 ⇒ 350.8 / 086.6 || 71.8
2016/07/22 || 00:43:32 ~ 00:52:23 || 00:08:51 || 225.6 ⇒ 314.5 / 270.7 || 07.2
————————————————————————————————————————–
2016/07/22 || 10:54:30 ~ 11:05:33 || 00:11:03 || 034.0 ⇒ 152.8 / 093.1 || 15.2
2016/07/22 || 12:29:50 ~ 12:42:20 || 00:12:30 || 002.4 ⇒ 211.8 / 289.9 || 37.8
————————————————————————————————————————–

[The latest TLE]

SPROUT                  
1 39770U 14029E   16202.77625515  .00001443  00000-0  17341-3 0  9992
2 39770  97.8738 299.6293 0008577 343.0045  17.0896 14.85475724116923

The downlink data format is.
JPN:http://sat.aero.cst.nihon-u.ac.jp/sprout/2-Formats%20of%20telemetry.html
ENG:http://sat.aero.cst.nihon-u.ac.jp/sprout-e/2-Formats%20of%20telemetry-e.html

2016/July/20 Nigttime Operation Report

皆様の受信報告はSPROUTの状態を解析するために役立てております.受信協力をお願い致します.現在はメインミッションの膜面展開を行い,展開したかどうかの確認をしております.
Your reception report is being used to analyze the state. We ask the cooperation of the reception. Then we are confirming the deployment of combined membrane structure which is SPROUT’s main mission.

[現在のSPROUTの状態]/[Current status of SPROUT]
現在SPROUTはCW(カスタムモード:G7/DEF/437.525[MHz])運用を行っています.
Current status of SPROUT is CW(custom mode:G7/DEF/437.525[MHz]).

[次回の運用内容]/[Next Operation]
FMダウンリンク(437.600[MHz]/1200bps/AFSK)を行います.
We will operate FM downlink(437.600[MHz]/1200bps/AFSK).

[運用のお知らせ]/[Operation info.]
SSTV運用(437.600[MHz])7月23日11:00~16:00,22:00~27:00(JST)に行います.
We will operate SSTV downlink(437.600[MHz]) on 23rd July. 11:00~16:00,22:00~27:00(JST).

[運用結果]/[Operational results]
2016/7/20 夜の運用を2回行いました.
2016/7/20 Nighttime operation: We have conducted 2 operations.

3rd:CW:S4[dB] FM:S5[dB] Digi:–[dB] Bus Voltage:3.822[V]
4th:CW:–[dB] FM:S4[dB] Digi:–[dB] Bus Voltage:-.—[V]

3rd:CW運用を行い,バス電圧3.822[V]を取得しました.その後,FMダウンリンク(437.600[MHz]/1200bps/AFSK)を行いました.
4th:FMダウンリンク(437.600[MHz]/1200bps/AFSK)を行いましたが,デコードには至りませんでした.

3rd:We confirmed bus voltage 3.822[V] by CW operation. After that, We operated FM downlink(437.600[MHz]/1200bps/AFSK).
4th:We operated FM downlink(437.600[MHz]/1200bps/AFSK).

[次回パス情報]/[Next pass info.]
日付 || 時刻:AOS ~ LOS || 可視時間 || 方位角: AOS時 ⇒ LOS時 / 最大迎角時 || 最大迎角
Date(JST) || Time of AOS ~ LOS || Duration || Azimuth at AOS ⇒ LOS / MEL || MEL
————————————————————————————————————————–
2016/07/21 || 10:40:09 ~ 10:50:01 || 00:09:52 || 040.8 ⇒ 141.8 / 092.4 || 09.8
2016/07/21 || 12:14:56 ~ 12:27:45 || 00:12:49 || 006.8 ⇒ 203.0 / 284.7 || 57.2
————————————————————————————————————————–
2016/07/21 || 21:32:52 ~ 21:40:09 || 00:07:17 || 096.2 ⇒ 025.6 / 060.9 || 04.6
2016/07/21 || 23:05:12 ~ 23:18:00 || 00:12:48 || 161.7 ⇒ 350.8 / 086.6 || 71.8
2016/07/22 || 00:43:32 ~ 00:52:23 || 00:08:51 || 225.6 ⇒ 314.5 / 270.7 || 07.2
————————————————————————————————————————–
2016/07/22 || 10:54:30 ~ 11:05:33 || 00:11:03 || 034.0 ⇒ 152.8 / 093.1 || 15.2
2016/07/22 || 12:29:50 ~ 12:42:20 || 00:12:30 || 002.4 ⇒ 211.8 / 289.9 || 37.8
————————————————————————————————————————–
[The latest TLE]

SPROUT                  
1 39770U 14029E   16200.75546123  .00001068  00000-0  13001-3 0  9997
2 39770  97.8732 297.6304 0008777 350.3025   9.8028 14.85468471116623

The downlink data format is.
JPN:http://sat.aero.cst.nihon-u.ac.jp/sprout/2-Formats%20of%20telemetry.html
ENG:http://sat.aero.cst.nihon-u.ac.jp/sprout-e/2-Formats%20of%20telemetry-e.html

2016/July/19 Nigttime Operation Report

皆様の受信報告はSPROUTの状態を解析するために役立てております.受信協力をお願い致します.現在はメインミッションの膜面展開を行い,展開したかどうかの確認をしております.
Your reception report is being used to analyze the state. We ask the cooperation of the reception. Then we are confirming the deployment of combined membrane structure which is SPROUT’s main mission.

[現在のSPROUTの状態]/[Current status of SPROUT]
現在SPROUTはCW(カスタムモード:G7/DEF/437.525[MHz])運用を行っています.
Current status of SPROUT is CW(custom mode:G7/DEF/437.525[MHz]).

[次回の運用内容]/[Next Operation]
FMダウンリンク(437.600[MHz]/1200bps/AFSK)を行います.
We will operate FM downlink(437.600[MHz]/1200bps/AFSK).

[運用のお知らせ]/[Operation info.]
SSTV運用(437.600[MHz])7月23日11:00~16:00,22:00~27:00(JST)に行います.
We will operate SSTV downlink(437.600[MHz]) on 23rd July. 11:00~16:00,22:00~27:00(JST).

[運用結果]/[Operational results]
2016/7/19 夜の運用を2回行いました.
2016/7/19 Nighttime operation: We have conducted 2 operations.

3rd:CW:S0[dB] FM:–[dB] Digi:–[dB] Bus Voltage:3.608[V]
4th:CW:–[dB] FM:S5[dB] Digi:–[dB] Bus Voltage:-.—[V]

3rd:CW運用を行い,バス電圧3.608[V]を取得しました.
4th:FMダウンリンク(437.600[MHz]/1200bps/AFSK)を行いましたが,デコードには至りませんでした.

3rd:We confirmed bus voltage 3.608[V] by CW operation.
4th:We operated FM downlink(437.600[MHz]/1200bps/AFSK).

[次回パス情報]/[Next pass info.]
日付 || 時刻:AOS ~ LOS || 可視時間 || 方位角: AOS時 ⇒ LOS時 / 最大迎角時 || 最大迎角
Date(JST) || Time of AOS ~ LOS || Duration || Azimuth at AOS ⇒ LOS / MEL || MEL
————————————————————————————————————————–
2016/07/20 || 10:26:04 ~ 10:34:11 || 00:08:07 || 049.5 ⇒ 128.9 / 089.7 || 05.6
2016/07/20 || 12:00:05 ~ 12:13:02 || 00:12:57 || 011.3 ⇒ 194.3 / 319.4 || 86.3
2016/07/20 || 13:37:36 ~ 13:45:54 || 00:08:18 || 338.3 ⇒ 257.0 / 298.6 || 06.3
————————————————————————————————————————–
2016/07/20 || 22:50:33 ~ 23:03:07 || 00:12:34 || 152.9 ⇒ 355.2 / 073.0 || 46.7
2016/07/21 || 00:27:50 ~ 00:38:09 || 00:10:19 || 213.5 ⇒ 322.2 / 268.1 || 11.8
————————————————————————————————————————–
2016/07/21 || 10:40:09 ~ 10:50:01 || 00:09:52 || 040.8 ⇒ 141.8 / 092.4 || 09.8
2016/07/21 || 12:14:56 ~ 12:27:45 || 00:12:49 || 006.8 ⇒ 203.0 / 284.7 || 57.2
————————————————————————————————————————–

[The latest TLE]

SPROUT                  
1 39770U 14029E   16200.55338149  .00001061  00000-0  12924-3 0  9998
2 39770  97.8731 297.4305 0008798 350.8878   9.2193 14.85467920116596

The downlink data format is.
JPN:http://sat.aero.cst.nihon-u.ac.jp/sprout/2-Formats%20of%20telemetry.html
ENG:http://sat.aero.cst.nihon-u.ac.jp/sprout-e/2-Formats%20of%20telemetry-e.html