2016/July/1 Nighttime Operation Report

皆様の受信報告はSPROUTの状態を解析するために役立てております.受信協力をお願い致します.現在はメインミッションの膜面展開を行い,展開したかどうかの確認をしております.
Your reception report is being used to analyze the state. We ask the cooperation of the reception. Then we are confirming the deployment of combined membrane structure which is SPROUT’s main mission.

[現在のSPROUTの状態]/[Current status of SPROUT]
現在SPROUTはCW(カスタムモード:G7/DEF/437.525[MHz])運用を行っています.
Current status of SPROUT is CW(custom mode:G7/DEF/437.525[MHz]).

[次回の運用内容]/[Next Operation]
SSTV運用(437.600[MHz])を行います.
We will operate SSTVdownlink(437.600[MHz]).

[運用のお知らせ]/[Operation info.]
SSTV運用(437.600[MHz])7月2日11:00~16:00,22:00~27:00(JST)に行います.
We will operate SSTV downlink(437.600[MHz]) on 2nd July. 11:00~16:00,22:00~27:00(JST).

[運用結果]/[Operational results]
2016/7/1 夜の運用を2回行いました.
2016/7/1 Nighttime operation: We have conducted 2 operations.

3rd:CW:S3[dB] FM:S4[dB] Digi:–[dB] Bus Voltage:3.833[V]
4th:CW:–[dB] FM:S3[dB] Digi:–[dB] Bus Voltage:-.—[V]

3rd:CW運用とFMR1リセットを行い,バス電圧3.833[V]を確認しました.
4th:TestFMダウンリンク(437.525[MHz]/1200bps/AFSK)を行いました.

3rd:We confirmed bus voltage 3.835[V] by CW operation and reset FMR1.
4th:We operated TestFM downlink(437.525[MHz]/1200bps/AFSK).

[次回パス情報]/[Next pass info.]
日付 || 時刻:AOS ~ LOS || 可視時間 || 方位角: AOS時 ⇒ LOS時 / 最大迎角時 || 最大迎角
Date(JST) || Time of AOS ~ LOS || Duration || Azimuth at AOS ⇒ LOS / MEL || MEL

————————————————————————————————————————–
2016/07/02 || 10:46:00 ~ 10:56:21 || 00:10:21 || 038.0 ⇒ 146.5 / 092.4 || 11.8
2016/07/02 || 12:21:01 ~ 12:33:40 || 00:12:39 || 004.9 ⇒ 206.7 / 285.5 || 47.6
————————————————————————————————————————–
2016/07/02 || 21:38:28 ~ 21:46:29 || 00:08:01 || 101.7 ⇒ 022.4 / 061.7 || 05.9
2016/07/02 || 23:11:16 ~ 23:24:03 || 00:12:47 || 165.5 ⇒ 348.9 / 067.6 || 86.0
2016/07/03 || 00:50:07 ~ 00:58:04 || 00:07:57 || 231.6 ⇒ 310.1 / 269.8 || 05.4
————————————————————————————————————————–
2016/07/03 || 11:00:26 ~ 11:11:51 || 00:11:25 || 031.5 ⇒ 157.2 / 095.2 || 17.8
2016/07/03 || 12:36:00 ~ 12:48:15 || 00:12:15 || 000.4 ⇒ 215.7 / 286.2 || 31.9
————————————————————————————————————————–
[The latest TLE]

SPROUT                  
1 39770U 14029E   16182.09647013  .00000883  00000-0  10861-3 0  9998
2 39770  97.8714 279.1794 0010318  49.0409 311.1709 14.85429364113858

The downlink data format is.
JPN:http://sat.aero.cst.nihon-u.ac.jp/sprout/2-Formats%20of%20telemetry.html
ENG:http://sat.aero.cst.nihon-u.ac.jp/sprout-e/2-Formats%20of%20telemetry-e.html

2016/July/01 Daytime Operation Report

皆様の受信報告はSPROUTの状態を解析するために役立てております.受信協力をお願い致します.現在はメインミッションの膜面展開を行い,展開したかどうかの確認をしております.
Your reception report is being used to analyze the state. We ask the cooperation of the reception. Then we are confirming the deployment of combined membrane structure which is SPROUT’s main mission.

[現在のSPROUTの状態]/[Current status of SPROUT]
現在SPROUTはCW(カスタムモード:G7/DEF/437.525[MHz])運用を行っています.
Current status of SPROUT is CW(custom mode:G7/DEF/437.525[MHz]).

[次回の運用内容]/[Next Operation]
TestFMダウンリンク(437.525[MHz]/1200bps/AFSK)を行います.
We will operate TestFM downlink(437.525[MHz]/1200bps/AFSK).

[運用のお知らせ]/[Operation info.]
SSTV運用(437.600[MHz])7月2日11:00~16:00,22:00~27:00(JST)に行います.
We will operate SSTV downlink(437.600[MHz]) on 2nd July. 11:00~16:00,22:00~27:00(JST).

[運用結果]/[Operational results]
2016/7/01 昼の運用を2回行いました.
2016/7/01 Daytime operation: We have conducted 2 operations.

1st:CW:S0[dB] FM:–[dB] Digi:–[dB] Bus Voltage:-.—[V]
2nd:CW:S1[dB] FM:–[dB] Digi:–[dB] Bus Voltage:4.548[V]

1st:CW運用を行いましたが,バス電圧の取得には至りませんでした.
2nd:CW運用を行いましたが,バス電圧4.648[V]を取得しました.その後,TestFMダウンリンク(437.525[MHz]/1200bps/AFSK)を行いました.

1st:We couldn’t confirm bus voltage by CW operation.
2nd:We confirmed bus voltage 4.648[V] by CW operation. After that, we operated TestFM downlink(437.525[MHz]/1200bps/AFSK).

[次回パス情報]/[Next pass info.]
日付 || 時刻:AOS ~ LOS || 可視時間 || 方位角: AOS時 ⇒ LOS時 / 最大迎角時 || 最大迎角
Date(JST) || Time of AOS ~ LOS || Duration || Azimuth at AOS ⇒ LOS / MEL || MEL
————————————————————————————————————————–
2016/07/01 || 22:56:31 ~ 23:09:10 || 00:12:39 || 156.6 ⇒ 353.4 / 075.1 || 55.9
2016/07/02 || 00:34:14 ~ 00:43:57 || 00:09:43 || 218.5 ⇒ 319.0 / 267.6 || 09.6
————————————————————————————————————————–
2016/07/02 || 10:46:00 ~ 10:56:21 || 00:10:21 || 038.0 ⇒ 146.5 / 092.4 || 11.8
2016/07/02 || 12:21:01 ~ 12:33:40 || 00:12:39 || 004.9 ⇒ 206.7 / 285.5 || 47.6
————————————————————————————————————————–
2016/07/02 || 21:38:28 ~ 21:46:29 || 00:08:01 || 101.7 ⇒ 022.4 / 061.7 || 05.9
2016/07/02 || 23:11:16 ~ 23:24:03 || 00:12:47 || 165.5 ⇒ 348.9 / 067.6 || 86.0
————————————————————————————————————————–
[The latest TLE]

SPROUT                  
1 39770U 14029E   16181.08604340  .00000617  00000-0  77776-4 0  9996
2 39770  97.8712 278.1802 0010502  51.3310 308.8841 14.85426351113704

The downlink data format is.
JPN:http://sat.aero.cst.nihon-u.ac.jp/sprout/2-Formats%20of%20telemetry.html
ENG:http://sat.aero.cst.nihon-u.ac.jp/sprout-e/2-Formats%20of%20telemetry-e.html

2016/June/30 Nighttime Operation Report

皆様の受信報告はSPROUTの状態を解析するために役立てております.受信協力をお願い致します.現在はメインミッションの膜面展開を行い,展開したかどうかの確認をしております.
Your reception report is being used to analyze the state. We ask the cooperation of the reception. Then we are confirming the deployment of combined membrane structure which is SPROUT’s main mission.

[現在のSPROUTの状態]/[Current status of SPROUT]
現在SPROUTはCW(カスタムモード:G7/DEF/437.525[MHz])運用を行っています.
Current status of SPROUT is CW(custom mode:G7/DEF/437.525[MHz]).

[次回の運用内容]/[Next Operation]
TestFMダウンリンク(437.525[MHz]/1200bps/AFSK)を行います.
We will operate TestFM downlink(437.525[MHz]/1200bps/AFSK).

[運用のお知らせ]/[Operation info.]
SSTV運用(437.600[MHz])7月2日11:00~16:00,22:00~27:00(JST)に行います.
We will operate SSTV downlink(437.600[MHz]) on 2nd July. 11:00~16:00,22:00~27:00(JST).

[運用結果]/[Operational results]
2016/6/30 夜の運用を2回行いました.
2016/6/30 Nighttime operation: We have conducted 2 operations.

3rd:CW:S3[dB] FM:S7[dB] Digi:–[dB] Bus Voltage:3.835[V]
4th:CW:–[dB] FM:S2[dB] Digi:–[dB] Bus Voltage:-.—[V]

3rd:CW運用を行い,バス電圧3.835[V]を確認しました.その後,TestFMダウンリンク(437.525[MHz]/1200bps/AFSK)を行いました.
4th:TestFMダウンリンク(437.525[MHz]/1200bps/AFSK)を行いました.

3rd:We confirmed bus voltage 3.835[V] by CW operation. After that, We operated TestFM downlink(437.525[MHz]/1200bps/AFSK).
4th:We operated TestFM downlink(437.525[MHz]/1200bps/AFSK).

[次回パス情報]/[Next pass info.]
日付 || 時刻:AOS ~ LOS || 可視時間 || 方位角: AOS時 ⇒ LOS時 / 最大迎角時 || 最大迎角
Date(JST) || Time of AOS ~ LOS || Duration || Azimuth at AOS ⇒ LOS / MEL || MEL
————————————————————————————————————————–
2016/07/01 || 10:31:45 ~ 10:40:37 || 00:08:52 || 045.9 ⇒ 134.5 / 090.1 || 07.2
2016/07/01 || 12:06:07 ~ 12:18:58 || 00:12:51 || 009.4 ⇒ 198.0 / 286.3 || 73.3
————————————————————————————————————————–
2016/07/01 || 22:56:31 ~ 23:09:10 || 00:12:39 || 156.6 ⇒ 353.4 / 075.1 || 55.9
2016/07/02 || 00:34:14 ~ 00:43:57 || 00:09:43 || 218.5 ⇒ 319.0 / 267.6 || 09.6
————————————————————————————————————————–
2016/07/02 || 10:46:00 ~ 10:56:21 || 00:10:21 || 038.0 ⇒ 146.5 / 092.4 || 11.8
2016/07/02 || 12:21:01 ~ 12:33:40 || 00:12:39 || 004.9 ⇒ 206.7 / 285.5 || 47.6
————————————————————————————————————————–

[The latest TLE]

SPROUT                  
1 39770U 14029E   16182.09647013  .00000883  00000-0  10861-3 0  9998
2 39770  97.8714 279.1794 0010318  49.0409 311.1709 14.85429364113858

The downlink data format is.
JPN:http://sat.aero.cst.nihon-u.ac.jp/sprout/2-Formats%20of%20telemetry.html
ENG:http://sat.aero.cst.nihon-u.ac.jp/sprout-e/2-Formats%20of%20telemetry-e.html

2016/June/29 Daytime Operation Report

皆様の受信報告はSPROUTの状態を解析するために役立てております.受信協力をお願い致します.現在はメインミッションの膜面展開を行い,展開したかどうかの確認をしております.
Your reception report is being used to analyze the state. We ask the cooperation of the reception. Then we are confirming the deployment of combined membrane structure which is SPROUT’s main mission.

[現在のSPROUTの状態]/[Current status of SPROUT]
現在SPROUTはCW(カスタムモード:G7/DEF/437.525[MHz])運用を行っています.
Current status of SPROUT is CW(custom mode:G7/DEF/437.525[MHz]).

[次回の運用内容]/[Next Operation]
TestFMダウンリンク(437.525[MHz]/1200bps/AFSK)を行います.
We will operate TestFM downlink(437.525[MHz]/1200bps/AFSK).

[運用のお知らせ]/[Operation info.]
SSTV運用(437.600[MHz])7月2日11:00~16:00,22:00~27:00(JST)に行います.
We will operate SSTV downlink(437.600[MHz]) on 2nd July. 11:00~16:00,22:00~27:00(JST).

[運用結果]/[Operational results]
2016/6/30 昼の運用を2回行いました.
2016/6/30 Daytime operation: We have conducted 2 operations.

1st:CW:S0[dB] FM:–[dB] Digi:–[dB] Bus Voltage:-.—[V]
2nd:CW:S0[dB] FM:–[dB] Digi:–[dB] Bus Voltage:-.—[V]

1st:CW運用を行いましたが,バス電圧の取得には至りませんでした.
2nd:CW運用を行いましたが,バス電圧の取得には至りませんでした.

1st:We couldn’t confirm bus voltage by CW operation.
2nd:We couldn’t confirm bus voltage by CW operation.

[次回パス情報]/[Next pass info.]
日付 || 時刻:AOS ~ LOS || 可視時間 || 方位角: AOS時 ⇒ LOS時 / 最大迎角時 || 最大迎角
Date(JST) || Time of AOS ~ LOS || Duration || Azimuth at AOS ⇒ LOS / MEL || MEL
————————————————————————————————————————–
2016/06/30 || 22:41:54 ~ 22:54:13 || 00:12:19 || 147.7 ⇒ 357.9 / 074.5 || 36.7
2016/07/01 || 00:18:40 ~ 00:29:35 || 00:10:55 || 207.3 ⇒ 326.0 / 267.5 || 15.0
————————————————————————————————————————–
2016/07/01 || 10:31:45 ~ 10:40:37 || 00:08:52 || 045.9 ⇒ 134.5 / 090.1 || 07.2
2016/07/01 || 12:06:07 ~ 12:18:59 || 00:12:52 || 009.4 ⇒ 198.0 / 286.9 || 73.3
————————————————————————————————————————–
[The latest TLE]

SPROUT                  
1 39770U 14029E   16181.08604340  .00000617  00000-0  77776-4 0  9996
2 39770  97.8712 278.1802 0010502  51.3310 308.8841 14.85426351113704

The downlink data format is.
JPN:http://sat.aero.cst.nihon-u.ac.jp/sprout/2-Formats%20of%20telemetry.html
ENG:http://sat.aero.cst.nihon-u.ac.jp/sprout-e/2-Formats%20of%20telemetry-e.html

2016/June/29 Nighttime Operation Report

皆様の受信報告はSPROUTの状態を解析するために役立てております.受信協力をお願い致します.現在はメインミッションの膜面展開を行い,展開したかどうかの確認をしております.
Your reception report is being used to analyze the state. We ask the cooperation of the reception. Then we are confirming the deployment of combined membrane structure which is SPROUT’s main mission.

[現在のSPROUTの状態]/[Current status of SPROUT]
現在SPROUTはCW(カスタムモード:G7/DEF/437.525[MHz])運用を行っています.
Current status of SPROUT is CW(custom mode:G7/DEF/437.525[MHz]).

[次回の運用内容]/[Next Operation]
TestFMダウンリンク(437.525[MHz]/1200bps/AFSK)を行います.
We will operate TestFM downlink(437.525[MHz]/1200bps/AFSK).

[運用のお知らせ]/[Operation info.]
SSTV運用(437.600[MHz])7月2日11:00~16:00,22:00~27:00(JST)に行います.
We will operate SSTV downlink(437.600[MHz]) on 2nd July. 11:00~16:00,22:00~27:00(JST).

[運用結果]/[Operational results]
2016/6/29 夜の運用を2回行いました.
2016/6/29 Nighttime operation: We have conducted 2 operations.

3rd:CW:S0[dB] FM:S0[dB] Digi:–[dB] Bus Voltage:3.677[V]
4th:CW:–[dB] FM:S5[dB] Digi:–[dB] Bus Voltage:-.—[V]

3rd:CW運用を行い,バス電圧3.677[V]を確認しました.その後,TestFMダウンリンク(437.525[MHz]/1200bps/AFSK)を行いました.
4th:TestFMダウンリンク(437.525[MHz]/1200bps/AFSK)を行いました.

3rd:We confirmed bus voltage 3.677[V] by CW operation. After that, We operated TestFM downlink(437.525[MHz]/1200bps/AFSK).
4th:We operated TestFM downlink(437.525[MHz]/1200bps/AFSK).

[次回パス情報]/[Next pass info.]
日付 || 時刻:AOS ~ LOS || 可視時間 || 方位角: AOS時 ⇒ LOS時 / 最大迎角時 || 最大迎角
Date(JST) || Time of AOS ~ LOS || Duration || Azimuth at AOS ⇒ LOS / MEL || MEL
————————————————————————————————————————–
2016/06/30 || 11:51:16 ~ 12:04:09 || 00:12:53 || 013.9 ⇒ 189.2 / 099.2 || 73.7
2016/06/30 || 13:28:28 ~ 13:37:34 || 00:09:06 || 342.0 ⇒ 250.3 / 296.2 || 08.4
————————————————————————————————————————–
2016/06/30 || 22:41:54 ~ 22:54:13 || 00:12:19 || 147.7 ⇒ 357.9 / 074.5 || 36.7
2016/07/01 || 00:18:40 ~ 00:29:35 || 00:10:55 || 207.3 ⇒ 326.0 / 267.5 || 15.0
————————————————————————————————————————–
2016/07/01 || 10:31:45 ~ 10:40:37 || 00:08:52 || 045.9 ⇒ 134.5 / 090.1 || 07.2
2016/07/01 || 12:06:07 ~ 12:18:59 || 00:12:52 || 009.4 ⇒ 198.0 / 286.9 || 73.3
————————————————————————————————————————–

[The latest TLE]

SPROUT                  
1 39770U 14029E   16181.08604340  .00000617  00000-0  77776-4 0  9996
2 39770  97.8712 278.1802 0010502  51.3310 308.8841 14.85426351113704

The downlink data format is.
JPN:http://sat.aero.cst.nihon-u.ac.jp/sprout/2-Formats%20of%20telemetry.html
ENG:http://sat.aero.cst.nihon-u.ac.jp/sprout-e/2-Formats%20of%20telemetry-e.html

2016/June/29 Daytime Operation Report

皆様の受信報告はSPROUTの状態を解析するために役立てております.受信協力をお願い致します.現在はメインミッションの膜面展開を行い,展開したかどうかの確認をしております.
Your reception report is being used to analyze the state. We ask the cooperation of the reception. Then we are confirming the deployment of combined membrane structure which is SPROUT’s main mission.

[現在のSPROUTの状態]/[Current status of SPROUT]
現在SPROUTはCW(カスタムモード:G7/DEF/437.525[MHz])運用を行っています.
Current status of SPROUT is CW(custom mode:G7/DEF/437.525[MHz]).

[次回の運用内容]/[Next Operation]
TestFMダウンリンク(437.525[MHz]/1200bps/AFSK)を行います.
We will operate TestFM downlink(437.525[MHz]/1200bps/AFSK).

[運用のお知らせ]/[Operation info.]
SSTV運用(437.600[MHz])7月2日11:00~16:00,22:00~27:00(JST)に行います.
We will operate SSTV downlink(437.600[MHz]) on 2nd July. 11:00~16:00,22:00~27:00(JST).

[運用結果]/[Operational results]
2016/6/29 昼の運用を2回行いました.
2016/6/29 Daytime operation: We have conducted 2 operations.

1st:CW:S0[dB] FM:–[dB] Digi:–[dB] Bus Voltage:-.—[V]
2nd:CW:–[dB] FM:S5[dB] Digi:–[dB] Bus Voltage:-.—[V]

1st:CW運用を行いましたが,バス電圧の取得には至りませんでした.その後,TestFMダウンリンク(437.525[MHz]/1200bps/AFSK)を行いました.
2nd:TestFMダウンリンク(437.525[MHz]/1200bps/AFSK)を行いました.

1st:We couldn’t confirm bus voltage by CW operation.After that, we operated TestFM downlink(437.525[MHz]/1200bps/AFSK).
2nd:We operated TestFM downlink(437.525[MHz]/1200bps/AFSK).

[次回パス情報]/[Next pass info.]
日付 || 時刻:AOS ~ LOS || 可視時間 || 方位角: AOS時 ⇒ LOS時 / 最大迎角時 || 最大迎角
Date(JST) || Time of AOS ~ LOS || Duration || Azimuth at AOS ⇒ LOS / MEL || MEL
————————————————————————————————————————–
2016/06/29 || 22:27:23 ~ 22:39:12 || 00:11:49 || 138.6 ⇒ 002.5 / 069.5 || 25.1
2016/06/30 || 00:03:18 ~ 00:15:03 || 00:11:45 || 197.1 ⇒ 331.9 / 264.5 || 22.2
————————————————————————————————————————–
2016/06/30 || 11:51:16 ~ 12:04:09 || 00:12:53 || 013.9 ⇒ 189.2 / 099.0 || 73.7
2016/06/30 || 13:28:28 ~ 13:37:34 || 00:09:06 || 342.0 ⇒ 250.3 / 296.2 || 08.4
————————————————————————————————————————–
2016/06/30 || 22:41:54 ~ 22:54:13 || 00:12:19 || 147.7 ⇒ 357.9 / 074.6 || 36.7
2016/07/01 || 00:18:40 ~ 00:29:35 || 00:10:55 || 207.3 ⇒ 326.0 / 267.4 || 15.0
————————————————————————————————————————–
[The latest TLE]

SPROUT                  
1 39770U 14029E   16180.07561409  .00000529  00000-0  67605-4 0  9994
2 39770  97.8714 277.1806 0010581  54.5151 305.7030 14.85424592113558

The downlink data format is.
JPN:http://sat.aero.cst.nihon-u.ac.jp/sprout/2-Formats%20of%20telemetry.html
ENG:http://sat.aero.cst.nihon-u.ac.jp/sprout-e/2-Formats%20of%20telemetry-e.html

2016/June/28 Nighttime Operation Report

皆様の受信報告はSPROUTの状態を解析するために役立てております.受信協力をお願い致します.現在はメインミッションの膜面展開を行い,展開したかどうかの確認をしております.
Your reception report is being used to analyze the state. We ask the cooperation of the reception. Then we are confirming the deployment of combined membrane structure which is SPROUT’s main mission.

[現在のSPROUTの状態]/[Current status of SPROUT]
現在SPROUTはCW(カスタムモード:G7/DEF/437.525[MHz])運用を行っています.
Current status of SPROUT is CW(custom mode:G7/DEF/437.525[MHz]).

[次回の運用内容]/[Next Operation]
TestFMダウンリンク(437.525[MHz]/1200bps/AFSK)を行います.
We will operate TestFM downlink(437.525[MHz]/1200bps/AFSK).

[運用のお知らせ]/[Operation info.]
SSTV運用(437.600[MHz])7月2日11:00~16:00,22:00~27:00(JST)に行います.
We will operate SSTV downlink(437.600[MHz]) on 2nd July. 11:00~16:00,22:00~27:00(JST).

[運用結果]/[Operational results]
2016/6/28 夜の運用を2回行いました.
2016/6/28 Nighttime operation: We have conducted 2 operations.

3rd:CW:S0[dB] FM:–[dB] Digi:–[dB] Bus Voltage:-.—[V]
4th:CW:S0[dB] FM:–[dB] Digi:–[dB] Bus Voltage:-.—[V]

3rd:CW運用を行いましたが,バス電圧の取得には至りませんでした.
4th:CW運用を行いましたが,バス電圧の取得には至りませんでした.

3rd:We couldn’t confirm bus voltage by CW operation.
4th:We couldn’t confirm bus voltage by CW operation.

[次回パス情報]/[Next pass info.]
日付 || 時刻:AOS ~ LOS || 可視時間 || 方位角: AOS時 ⇒ LOS時 / 最大迎角時 || 最大迎角
Date(JST) || Time of AOS ~ LOS || Duration || Azimuth at AOS ⇒ LOS / MEL || MEL
————————————————————————————————————————–
2016/06/29 || 11:36:29 ~ 11:49:12 || 00:12:43 || 018.6 ⇒ 180.4 / 100.4 || 47.4 *
2016/06/29 || 13:13:10 ~ 13:23:32 || 00:10:22 || 348.1 ⇒ 239.3 / 293.7 || 12.8
————————————————————————————————————————–
2016/06/29 || 22:27:23 ~ 22:39:12 || 00:11:49 || 138.6 ⇒ 002.5 / 069.5 || 25.1
2016/06/30 || 00:03:18 ~ 00:15:03 || 00:11:45 || 197.1 ⇒ 331.9 / 264.5 || 22.2
————————————————————————————————————————–
2016/06/30 || 11:51:16 ~ 12:04:09 || 00:12:53 || 013.9 ⇒ 189.2 / 099.0 || 73.7 *
2016/06/30 || 13:28:28 ~ 13:37:34 || 00:09:06 || 342.0 ⇒ 250.3 / 296.2 || 08.4
————————————————————————————————————————–

[The latest TLE]

SPROUT                  
1 39770U 14029E   16180.07561409  .00000529  00000-0  67605-4 0  9994
2 39770  97.8714 277.1806 0010581  54.5151 305.7030 14.85424592113558

The downlink data format is.
JPN:http://sat.aero.cst.nihon-u.ac.jp/sprout/2-Formats%20of%20telemetry.html
ENG:http://sat.aero.cst.nihon-u.ac.jp/sprout-e/2-Formats%20of%20telemetry-e.html

2016/June/28 Daytime Operation Report

皆様の受信報告はSPROUTの状態を解析するために役立てております.受信協力をお願い致します.現在はメインミッションの膜面展開を行い,展開したかどうかの確認をしております.
Your reception report is being used to analyze the state. We ask the cooperation of the reception. Then we are confirming the deployment of combined membrane structure which is SPROUT’s main mission.

[現在のSPROUTの状態]/[Current status of SPROUT]
現在SPROUTはCW(カスタムモード:G7/DEF/437.525[MHz])運用を行っています.
Current status of SPROUT is CW(custom mode:G7/DEF/437.525[MHz]).

[次回の運用内容]/[Next Operation]
TestFMダウンリンク(437.525[MHz]/1200bps/AFSK)を行います.
We will operate TestFM downlink(437.525[MHz]/1200bps/AFSK).

[運用のお知らせ]/[Operation info.]
SSTV運用(437.600[MHz])7月2日11:00~16:00,22:00~27:00(JST)に行います.
We will operate SSTV downlink(437.600[MHz]) on 2nd July. 11:00~16:00,22:00~27:00(JST).

[運用結果]/[Operational results]
2016/6/28 昼の運用を2回行いました.
2016/6/28 Daytime operation: We have conducted 2 operations.

1st:CW:–[dB] FM:–[dB] Digi:–[dB] Bus Voltage:-.—[V]
2nd:CW:–[dB] FM:–[dB] Digi:–[dB] Bus Voltage:-.—[V]

1st:CW運用を行いましたが,バス電圧の取得には至りませんでした.
2nd:CW運用を行いましたが,バス電圧の取得には至りませんでした.

1st:We couldn’t confirm bus voltage by CW operation.
2nd:We couldn’t confirm bus voltage by CW operation.

[次回パス情報]/[Next pass info.]
日付 || 時刻:AOS ~ LOS || 可視時間 || 方位角: AOS時 ⇒ LOS時 / 最大迎角時 || 最大迎角
Date(JST) || Time of AOS ~ LOS || Duration || Azimuth at AOS ⇒ LOS / MEL || MEL
————————————————————————————————————————–
2016/06/28 || 22:13:01 ~ 22:24:06 || 00:11:05 || 129.0 ⇒ 007.4 / 069.1 || 17.4
2016/06/28 || 23:48:05 ~ 00:00:24 || 00:00:23 || 336.0 ⇒ 337.2 / 260.4 || 32.8
————————————————————————————————————————–
2016/06/29 || 11:36:28 ~ 11:49:11 || 00:12:43 || 018.6 ⇒ 180.4 / 101.0 || 47.4 *
2016/06/29 || 13:13:09 ~ 13:23:31 || 00:10:22 || 348.1 ⇒ 239.3 / 293.5 || 12.8
————————————————————————————————————————–

[The latest TLE]

SPROUT                  
1 39770U 14029E   16179.06518297  .00000683  00000-0  85500-4 0  9993
2 39770  97.8716 276.1817 0010605  57.5436 302.6765 14.85423977113408

The downlink data format is.
JPN:http://sat.aero.cst.nihon-u.ac.jp/sprout/2-Formats%20of%20telemetry.html
ENG:http://sat.aero.cst.nihon-u.ac.jp/sprout-e/2-Formats%20of%20telemetry-e.html

2016/June/27 Nighttime Operation Report

皆様の受信報告はSPROUTの状態を解析するために役立てております.受信協力をお願い致します.現在はメインミッションの膜面展開を行い,展開したかどうかの確認をしております.
Your reception report is being used to analyze the state. We ask the cooperation of the reception. Then we are confirming the deployment of combined membrane structure which is SPROUT’s main mission.

[現在のSPROUTの状態]/[Current status of SPROUT]
現在SPROUTはCW(カスタムモード:G7/DEF/437.525[MHz])運用を行っています.
Current status of SPROUT is CW(custom mode:G7/DEF/437.525[MHz]).

[次回の運用内容]/[Next Operation]
TestFMダウンリンク(437.525[MHz]/1200bps/AFSK)を行います.
We will operate TestFM downlink(437.525[MHz]/1200bps/AFSK).

[運用のお知らせ]/[Operation info.]
SSTV運用(437.600[MHz])7月2日11:00~16:00,22:00~27:00(JST)に行います.
We will operate SSTV downlink(437.600[MHz]) on 2nd July. 11:00~16:00,22:00~27:00(JST).

[運用結果]/[Operational results]
2016/6/27 夜の運用を2回行いました.
2016/6/27 Nighttime operation: We have conducted 2 operations.

3rd:CW:S0[dB] FM:–[dB] Digi:–[dB] Bus Voltage:-.—[V]
4th:CW:S0[dB] FM:–[dB] Digi:–[dB] Bus Voltage:-.—[V]

3rd:CW運用を行いましたが,バス電圧の取得には至りませんでした.
4th::CW運用を行いましたが,バス電圧の取得には至りませんでした.

3rd:We couldn’t confirm bus voltage by CW operation.
4th:We couldn’t confirm bus voltage by CW operation.

[次回パス情報]/[Next pass info.]
日付 || 時刻:AOS ~ LOS || 可視時間 || 方位角: AOS時 ⇒ LOS時 / 最大迎角時 || 最大迎角
Date(JST) || Time of AOS ~ LOS || Duration || Azimuth at AOS ⇒ LOS / MEL || MEL
————————————————————————————————————————–
2016/06/28 || 11:21:45 ~ 11:34:06 || 00:12:21 || 023.5 ⇒ 171.3 / 095.3 || 31.3
2016/06/28 || 12:57:59 ~ 13:09:17 || 00:11:18 || 353.4 ⇒ 229.3 / 290.5 || 18.6
————————————————————————————————————————–
2016/06/28 || 22:13:01 ~ 22:24:06 || 00:11:05 || 129.0 ⇒ 007.4 / 069.1 || 17.4
2016/06/28 || 23:48:05 ~ 00:00:24 || 00:00:23 || 336.0 ⇒ 337.2 / 260.4 || 32.8
————————————————————————————————————————–
2016/06/29 || 11:36:28 ~ 11:49:11 || 00:12:43 || 018.6 ⇒ 180.4 / 101.0 || 47.4 *
2016/06/29 || 13:13:09 ~ 13:23:31 || 00:10:22 || 348.1 ⇒ 239.3 / 293.5 || 12.8
————————————————————————————————————————–

[The latest TLE]

SPROUT                  
1 39770U 14029E   16179.06518297  .00000683  00000-0  85500-4 0  9993
2 39770  97.8716 276.1817 0010605  57.5436 302.6765 14.85423977113408

The downlink data format is.
JPN:http://sat.aero.cst.nihon-u.ac.jp/sprout/2-Formats%20of%20telemetry.html
ENG:http://sat.aero.cst.nihon-u.ac.jp/sprout-e/2-Formats%20of%20telemetry-e.html

2016/June/27 Daytime Operation Report

皆様の受信報告はSPROUTの状態を解析するために役立てております.受信協力をお願い致します.現在はメインミッションの膜面展開を行い,展開したかどうかの確認をしております.
Your reception report is being used to analyze the state. We ask the cooperation of the reception. Then we are confirming the deployment of combined membrane structure which is SPROUT’s main mission.

[現在のSPROUTの状態]/[Current status of SPROUT]
現在SPROUTはCW(カスタムモード:G7/DEF/437.525[MHz])運用を行っています.
Current status of SPROUT is CW(custom mode:G7/DEF/437.525[MHz]).

[次回の運用内容]/[Next Operation]
TestFMダウンリンク(437.525[MHz]/1200bps/AFSK)を行います.
We will operate TestFM downlink(437.525[MHz]/1200bps/AFSK).

[運用のお知らせ]/[Operation info.]
SSTV運用(437.600[MHz])7月2日11:00~16:00,22:00~27:00(JST)に行います.
We will operate SSTV downlink(437.600[MHz]) on 2nd July. 11:00~16:00,22:00~27:00(JST).

[運用結果]/[Operational results]
2016/6/27 昼の運用を2回行いました.
2016/6/27 Daytime operation: We have conducted 2 operations.

1st:CW:–[dB] FM:–[dB] Digi:–[dB] Bus Voltage:-.—[V]
2nd:CW:–[dB] FM:S7[dB] Digi:–[dB] Bus Voltage:-.—[V]

1st:CW運用を行いましたが,バス電圧の取得には至りませんでした.
2nd:TestFMダウンリンクを行いました.

1st:We couldn’t confirm bus voltage by CW operation.
2nd:We operated TestFM downlink(437.525[MHz]/1200bps/AFSK).

[次回パス情報]/[Next pass info.]
日付 || 時刻:AOS ~ LOS || 可視時間 || 方位角: AOS時 ⇒ LOS時 / 最大迎角時 || 最大迎角
Date(JST) || Time of AOS ~ LOS || Duration || Azimuth at AOS ⇒ LOS / MEL || MEL
————————————————————————————————————————–
2016/06/27 || 21:58:49 ~ 22:08:54 || 00:10:05 || 118.7 ⇒ 012.9 / 066.1 || 11.9
2016/06/27 || 23:33:01 ~ 23:45:40 || 00:12:39 || 178.5 ⇒ 342.1 / 259.8 || 50.1
————————————————————————————————————————–
2016/06/28 || 11:21:45 ~ 11:34:06 || 00:12:21 || 023.5 ⇒ 171.3 / 095.3 || 31.3
2016/06/28 || 12:57:59 ~ 13:09:17 || 00:11:18 || 353.4 ⇒ 229.3 / 290.5 || 18.6
————————————————————————————————————————–
2016/06/28 || 22:13:01 ~ 22:24:06 || 00:11:05 || 129.0 ⇒ 007.4 / 069.1 || 17.4
2016/06/28 || 23:48:05 ~ 00:00:24 || 00:00:23 || 336.0 ⇒ 337.2 / 260.4 || 32.8
————————————————————————————————————————–

[The latest TLE]

SPROUT                  
1 39770U 14029E   16177.85266471  .00001218  00000-0  14756-3 0  9991
2 39770  97.8719 274.9833 0010665  61.0122 299.2139 14.85424332113225

The downlink data format is.
JPN:http://sat.aero.cst.nihon-u.ac.jp/sprout/2-Formats%20of%20telemetry.html
ENG:http://sat.aero.cst.nihon-u.ac.jp/sprout-e/2-Formats%20of%20telemetry-e.html