The latest TLE

Space Track(https://www.space-track.org)にOBJECTがアップされました.
まだどのOBJECTもさほどズレはないため,日大地上局は次回パスをOBJECT Dで追跡する予定です.

OBJECT A
1 39766U 14029A 14144.17460865 -.00000051 00000-0 00000+0 0 18
2 39766 097.8806 241.7043 0006280 206.4674 153.6316 14.79526751 09
OBJECT B
1 39767U 14029B 14144.26003053 -.00000052 00000-0 00000+0 0 23
2 39767 097.8693 241.7844 0003049 244.0124 211.3022 14.81550075 17
OBJECT C
1 39768U 14029C 14144.25994766 -.00000052 00000-0 00000+0 0 12
2 39768 097.8649 241.7817 0002713 005.8075 089.3442 14.81868824 17
OBJECT D
1 39769U 14029D 14144.31686235 -.00000052 00000-0 00000+0 0 19
2 39769 097.8736 241.8390 0013697 065.0542 333.4651 14.80320336 28
OBJECT E
1 39770U 14029E 14144.31675716 -.00000052 00000-0 00000+0 0 13
2 39770 097.8707 241.8388 0016714 051.8196 346.5174 14.81098484 06

次回パスは以下のようになります.
日付//AOS//LOS//可視時間//AOS時方位角//LOS時方位角//最大迎角時方位角//最大迎角
2014/05/24土//21:24:43//21:30:33//00:05:50//88.4//31.6//59.7//2.8
2014/05/24土//2:56:23//23:08:50//00:12:27//158.0//352.7//71.8//59.3
2014/05/25日//00:34:16//00:43:27//00:09:11//221.1//316.8//268.6//8.5

The latest TLE

ALOS-2分離時刻が12:21:00に行なわれたので,その時刻を基準としたTLEを作成しました.

SPROUT
1 00000U 14001A 14144.15446759 .00000000 00000-0 00000-0 0 0013
2 00000 97.8740 241.6718 0035980 58.6810 194.6458 14.85960816 14

打ち上げ後の運用スケジュール

打上から一週間分の運用の流れは次のとおりです.

大まかには,通信系の確立や電源の電力収支の確認を行って参ります.通信に関しては,最初にCWを行います.その後FMダウンリンクのテストを行います.電源系は電圧値の読み取り等を行います.TLEが発行されるまでは,軌道決定も随時行ってまいります.

以下に,最新のTLEと日にち毎の運用の予定を示します.

 In a week from the SPLOUT launch, we will do following operation.

Generally speaking, we will establish communication system in SPROUT and check electronic power supply system. In communication system, at first, we will use CW. After that, we will test about FM downlink. In electronic power supply system, we will read voltage value and so on. Until NORAD issue TLE, we will also do orbit determination at any time.

I show you the latest TLE and list of operation.

 

TLE: SPROUT
1 00000U 14001A 14144.15446759 .00000000 00000-0 00000-0 0 0013
2 00000 97.8740 241.6718 0035980 58.6810 194.6458 14.85960816 14
(Latest:2014/05/24/13:10)
 

1日目1stパス(13:44:04~,7分間程度):データ送受信確立と確認

→1.テレメトリ開始確認

2.CWビーコン電波受信

3.テレメトリデータの確認

4.アップリンクの確認

5.ビーコン電波測定に基づく軌道決定

 

1日目2nd~3rdパス:システム健全性確認→1.テレメトリ開始確認

2.CWビーコン電波受信

3.テレメトリデータの確認

4.アップリンクの確認

5.ビーコン電波測定に基づく軌道決定

 

2日目1stパス:システム健全性確認→1.テレメトリ開始確認

2.CWビーコン電波受信

3.テレメトリデータの確認

4.アップリンクの確認

5.ビーコン電波測定に基づく軌道決定

 

2日目2nd~6thパス:電力収支の確認

→1.テレメトリ開始確認

2.CWビーコン電波受信

3.テレメトリデータの確認

4.ビーコン電波測定に基づく軌道決定

 

3日目1st~5thパス:電力収支の確認

→1.テレメトリ開始確認

2.CWビーコン電波受信

3.テレメトリデータの確認

4.ビーコン電波測定に基づく軌道決定

 

4日目1st~2ndパス:電力収支の確認

→1.テレメトリ開始確認

2.CWビーコン電波受信

3.テレメトリデータの確認

4.ビーコン電波測定に基づく軌道決定

 

4日目3rdパス:データ送受信確率と確認

→1.テレメトリ開始確認

2.CWビーコン電波受信

3.テレメトリデータの確認

4.1200bpsFMダウンリンクの確認

5.ビーコン電波測定に基づく軌道決定

 

4日目4thパス:電力収支の確認

→1.テレメトリ開始確認

2.CWビーコン電波受信

3.テレメトリデータの確認

4.ビーコン電波測定に基づく軌道決定

 

4日目5thパス:電力収支,システム健全性の確認

→1.テレメトリ開始確認

2.CWビーコン電波受信

3.テレメトリデータの確認

4.1200bpsFMダウンリンクの確認

5.ビーコン電波測定に基づく軌道決定

 

5日目1stパス:電力収支の確認

→1.テレメトリ開始確認

2.CWビーコン電波受信

3.テレメトリデータの確認

4.ビーコン電波測定に基づく軌道決定

 

5日目2ndパス:電力収支,システム健全性の確認

→1.テレメトリ開始確認

2.CWビーコン電波受信

3.テレメトリデータの確認

4.1200bpsFMダウンリンクの確認

5.ビーコン電波測定に基づく軌道決定

 

5日目3rdパス:電力収支の確認

→1.テレメトリ開始確認

2.CWビーコン電波受信

3.テレメトリデータの確認

4.ビーコン電波測定に基づく軌道決定

 

5日目4thパス:電力収支,システム健全性の確認

→1.テレメトリ開始確認

2.CWビーコン電波受信

3.テレメトリデータの確認

4.1200bpsFMダウンリンクの確認

5.ビーコン電波測定に基づく軌道決定

 

6日目1stパス:電力収支,システム健全性の確認

→1.テレメトリ開始確認

2.CWビーコン電波受信

3.テレメトリデータの確認

4.1200bpsFMダウンリンクの確認

5.ビーコン電波測定に基づく軌道決定

 

6日目2ndパス:データ送受信確立の確認

→1.テレメトリ開始確認

2.CWビーコン電波受信

3.テレメトリデータの確認

4.ビーコン電波測定に基づく軌道決定

 

6日目3rdパス:データ送受信確立の確認

→1.テレメトリ開始確認

2.CWビーコン電波受信

3.テレメトリデータの確認

4.1200bpsFMダウンリンクの確認

5.ビーコン電波測定に基づく軌道決定

 

6日目4thパス:データ送受信確立の確認

→1.テレメトリ開始確認

2.CWビーコン電波受信

3.テレメトリデータの確認

4.ビーコン電波測定に基づく軌道決定

 

7日目1st~2ndパス:データ送受信確立の確認

→1.テレメトリ開始確認

2.CWビーコン電波受信

3.テレメトリデータの確認

4.1200bpsFMダウンリンクの確認

5.ビーコン電波測定に基づく軌道決定

 

7日目3rdパス:データ送受信確立の確認

→1.テレメトリ開始確認

2.CWビーコン電波受信

3.テレメトリデータの確認

4.ビーコン電波測定に基づく軌道決定

 

 

・1st path in 1st day (13:44:04~, about 7 min.): establish and check communication.

→1.check the starting telemetry.

2. receive beacon of CW.

3. check the telemetry data.

4. check the up-link.

5. determine orbit by the observation of beacon.

 

・2nd to 3rd path in 1st day: check of system’s soundness.

→1.check the starting telemetry.

2. receive beacon of CW.

3. check the telemetry data.

4. check the up-link.

5. determine orbit by the observation of beacon.

 

・1st path in 2nd day: check of system’s soundness.

→1.check the starting telemetry.

2. receive beacon of CW.

3. check the telemetry data.

4. check the up-link.

5. determine orbit by the observation of beacon.

 

・From 2nd to 6th path in 2nd day: check electronic power supply systems.

→1.check the starting telemetry.

2. receive beacon of CW.

3. check the telemetry data.

4. determine orbit by the observation of beacon.

 

・From 1st to 5th path in 3rd day: check electronic power supply systems.

→1.check the starting telemetry.

2. receive beacon of CW.

3. check the telemetry data.

4. determine orbit by the observation of beacon.

 

・1st and 2nd path in 4th day: check electronic power supply systems.

→1.check the starting telemetry.

2. receive beacon of CW.

3. check the telemetry data.

4. determine orbit by the observation of beacon.

 

・3rd path in 4th day: establish and check communication

→1.check the starting telemetry.

2. receive beacon of CW.

3. check the telemetry data.

4. check downlink of FM 1200bps

5. determine orbit by the observation of beacon.

 

・4th path in 4th day: check electronic power supply systems.

→1.check the starting telemetry.

2. receive beacon of CW.

3. check the telemetry data.

4. determine orbit by the observation of beacon.

 

・5th path in 4th day: check electronic power supply system and system’s soundness

→1.check the starting telemetry.

2. receive beacon of CW.

3. check the telemetry data.

4. check downlink of FM 1200bps

5. determine orbit by the observation of beacon.

 

・1st path in 5th day: check electronic power supply systems.

→1.check the starting telemetry.

2. receive beacon of CW.

3. check the telemetry data.

4. determine orbit by the observation of beacon.

 

・2nd path in 5th day: check electronic power supply system and system’s soundness

→1.check the starting telemetry.

2. receive beacon of CW.

3. check the telemetry data.

4. check downlink of FM 1200bps

5. determine orbit by the observation of beacon.

 

・3rd path in 5th day: check electronic power supply systems.

→1.check the starting telemetry.

2. receive beacon of CW.

3. check the telemetry data.

4. determine orbit by the observation of beacon.

 

・4th path in 5th day: check electronic power supply system and system’s soundness

→1.check the starting telemetry.

2. receive beacon of CW.

3. check the telemetry data.

4. check downlink of FM 1200bps

5. determine orbit by the observation of beacon.

 

・1st path in 6th day: check electronic power supply system and system’s soundness

→1.check the starting telemetry.

2. receive beacon of CW.

3. check the telemetry data.

4. check downlink of FM 1200bps

5. determine orbit by the observation of beacon.

 

・2nd path in 6th day: check establishment of data communication

→1.check the starting telemetry.

2. receive beacon of CW.

3. check the telemetry data.

4. determine orbit by the observation of beacon.

 

・3rd path in 6th day: check establishment of data communication

→1.check the starting telemetry.

2. receive beacon of CW.

3. check the telemetry data.

4. check downlink of FM 1200bps

5. determine orbit by the observation of beacon.

 

・4th path in 6th day: check establishment of data communication

→1.check the starting telemetry.

2. receive beacon of CW.

3. check the telemetry data.

4. determine orbit by the observation of beacon.

 

・1st to 3rd path in 7th day: check establishment of data communication

→1.check the starting telemetry.

2. receive beacon of CW.

3. check the telemetry data.

4. check downlink of FM 1200bps

5. determine orbit by the observation of beacon.

 

・4th to 6th path in 7th day: check establishment of data communication

→1.check the starting telemetry.

2. receive beacon of CW.

3. check the telemetry data.

4. determine orbit by the observation of beacon.

 

最新予想TLE

SPROUTの軌道投入時の予想TLEを改訂いたしました.

SPROUT
1 00000U 14001A 14144.15426352 .00000000 00000-0 00000-0 0 10
2 00000 097.8740 241.6133 0035980 058.6810 194.6458 14.85960816 15